• Phone

    0086-755-27284387

  • Address

    3-2, Beifang Yongfa Tech Park, Zhuangcun, Shajing, Shenzhen, Guangdong, China

  • E-mail

    k@waimaotong.com

LatestProducts

                            Custom CNC Turning  CNC lathe parts CNC machining parts with 3/4/5 axis machine manufacture factory

                            Custom CNC Turning  CNC lathe parts CNC machining parts with 3/4/5 axis machine manufacture factory

                            Custom CNC Turning  CNC lathe parts CNC machining parts with 3/4/5 axis machine manufacture factory

                            Custom CNC Turning  CNC lathe parts CNC machining parts with 3/4/5 axis machine manufacture factory

                            Custom CNC Turning  CNC lathe parts CNC machining parts with 3/4/5 axis machine manufacture factory

Custom CNC Turning CNC lathe parts CNC machining parts with 3/4/5 axis machine manufacture factory

Custom CNC Turning CNC lathe parts CNC machining parts with 3/4/5 axis machine manufacture factory,
INQUIRY PRECISE INQUIRY
Description

CNC Machining or Not:
CNC Machining
Type:
Broaching, Drilling, Etching / Chemical Machining, Laser Machining, Milling, Other Machining Services, Rapid Prototyping, Turning, Wire EDM
Material Capabilities:
Aluminum, Brass, Bronze, Copper, Hardened Metals, Precious Metals, Stainless Steel, Steel Alloys, POM, PEEK, Nylon, Acrylic... engineering plastic
Micro Machining or Not:
Not Micro Machining
Place of Origin:
Guangdong, China
Model Number:
OEM
Brand Name:
SZJC
Product name:
CNC Turning /CNC lathe parts/CNC machining parts
Application:
Automotive, Aerospace, Hydraulic, Lighting, Medical, Safety
Process:
CNC Machining
Material:
Stainless Steel, Copper, Brass, Aluminium, Engineering Plastics
Surface treatment:
polishing/ brush/ sand blasting, anodize, plating
Tolerance:
normal for +/-0.005mm
Service:
Machining CNC Milling CNC Turning Aerospace CNC Machining Part
Inspection:
100% inspection before shipping
Payment Terms:
Trade Assurance, TT/Paypal
Lead Time:
1 weeks for samples,2-4 weeks for mass production
{1}{2}{3}